Construction of pressure sewer pipelines from the chamber with pumping equipment on the existing collector to the point of connection to the centralized drainage system
Implementation of construction, installation and commissioning works (including supply of materials) within the framework of the construction project of the 220 kV “Kolima HPP – Ust-Srednekanskaya HPP” line.