Skip to content Skip to footer
post34
  • Construction of pressure sewer pipelines from the chamber with pumping equipment on the existing collector to the point of connection to the centralized drainage system

  • Implementation of construction, installation and commissioning works (including supply of materials) within the framework of the construction project of the 220 kV “Kolima HPP – Ust-Srednekanskaya HPP” line.